CONTACTS

Installation and Dismantling of Air-Supported Structures

Air-supported structures are a versatile and functional solution to protect sports facilities and multi-purpose spaces during the winter months.

To guarantee their maximum performance and longevity, it is essential to rely on expert professionals for the installation and dismantling of these structures.

REQUEST A QUOTE
Request a quote from our technical office

Why Trust Europasport?

Experience and Professionalism

Our team boasts years of experience in the sector, guaranteeing rapid and efficient interventions.

Use of Specialized Equipment

We have advanced tools and technologies for a safe and precise installation and dismantling.

Guaranteed Safety

Every operation is performed in compliance with current regulations, minimizing risks for people and structures.

Personalized Service

We offer tailor-made solutions for every type of sports facility or covered structure.

Post-Installation Maintenance and Support

After each intervention, we provide technical support and advice for the proper preservation of the covering.
We offer a complete and specialized service for the installation and removal of air-supported structures, ensuring efficiency, safety, and quick intervention times.

Procedure

Installation of Air-Supported Domes

The installation of an air-supported structure requires precision and technical expertise. Our team handles:
Preparation of the installation area verifying ground conditions and preparing the anchorages.
Positioning and securing the air-supported membrane ensuring a stable and resistant installation.
Connection of ventilation and lighting systems essential for the proper operation of the structure.
Safety tests and final commissioning to ensure the maximum efficiency of the covering.
If you need a safe and efficient installation or dismantling for your air-supported structure, rely on our experts. Contact us today for a personalized quote!

Procedure

Dismantling of Air-Supported Domes

The dismantling must be performed with care to preserve the integrity of the covering and ensure its reuse in subsequent seasons. The main phases include:
Shutting down and disconnection of ventilation systems.
Controlled deflation of the air-supported membrane, avoiding damage to the material.
Removal of anchorages and folding of the membrane, for proper storage.
Checking of the covering's conditions and suggestions for maintenance.
Are you ready for the new season?

FAQ

Frequently Asked Questions
The time varies based on the size of the structure, but generally the process is completed in 1-3 days.
Yes, it is advisable to have a dry and clean area to store the membrane in good condition.
Yes, we offer maintenance and repair services to extend the lifespan of the structure.

The gallery

Look at some shots of our work
Powered by
Copyright © Europasport Ticino di Capatina Sorin Ionut | All rights reserved
apartmentflagstorecartmenuchevron-down